OUR BUILDING PROCESS

At Dhillon Property Group, we aim to make the building process simple, transparent and well organised. From the initial design through to handover, our team manages each stage of your project.

PRE-CONSTRUCTION PROCESS

Allow approximately 2–3 months

Step 1 — Design & Floorplan

Select one of our existing floorplans, or customise a floorplan to suit your requirements.

Our team will work with you to finalise the design and inclusions.

Step 2 — Quotation

We will provide a detailed quotation based on your selected design, specifications and requirements.

Step 3 — Deposit

Once you are happy to proceed, the required deposit is paid and we commence the pre-construction process.

Step 4 — Plans & Approvals

We coordinate the preparation of the documentation required for your project, which may include:

  • Working drawings
  • Structural engineering
  • Soil test
  • Acoustic/noise assessment, where required
  • BAL assessment, where required
  • Energy assessment/report
  • CDC documentation, where applicable

Step 5 — Insurance & Building Permit

Apply for the required construction insurance.

Prepare and lodge the building permit application.

Once the building permit is approved, construction can commence.

CONSTRUCTION PROCESS

Construction commences after the building permit is approved.

Stage 1 — Site Preparation

Site clean-up, preparation and initial site works.

Stage 2 — Slab Preparation

Preparation of the site, including required earthworks, formwork and reinforcement.

Stage 3 — Slab Down

Construction and completion of the concrete slab.

Stage 4 — Brickwork / Framework

Construction of the main structural walls and framing.

Stage 5 — Roof Cover

Installation of the roof structure and roof covering.

Stage 6 — Lock-Up

The building is secured with external doors, windows and other required lock-up elements.

Stage 7 — Internal Works & Completion

Internal fit-out, services, finishes, fixtures and final building works are completed in accordance with the building contract.

Stage 8 — Final Inspection & Handover

Final quality checks are completed, outstanding items are addressed and the completed home is prepared for handover.

ESTIMATED CONSTRUCTION TIMEFRAMES

Single Storey Home:

Approximately 6–8 months from commencement of construction, depending on the design, size and level of customisation.

Double Storey Home:

Approximately 10–12 months from commencement of construction, depending on the design, size and level of customisation.

Please Note Construction timeframes are estimates only and may vary depending on the complexity of the project, site conditions, approvals, material availability, weather, variations and other circumstances outside the builder’s reasonable control.