OUR BUILDING PROCESS
PRE-CONSTRUCTION PROCESS
Step 1 — Design & Floorplan
Select one of our existing floorplans, or customise a floorplan to suit your requirements.
Our team will work with you to finalise the design and inclusions.
Step 2 — Quotation
Step 3 — Deposit
Step 4 — Plans & Approvals
We coordinate the preparation of the documentation required for your project, which may include:
- Working drawings
- Structural engineering
- Soil test
- Acoustic/noise assessment, where required
- BAL assessment, where required
- Energy assessment/report
- CDC documentation, where applicable
Step 5 — Insurance & Building Permit
Apply for the required construction insurance.
Prepare and lodge the building permit application.
Once the building permit is approved, construction can commence.
CONSTRUCTION PROCESS
Stage 1 — Site Preparation
Stage 2 — Slab Preparation
Stage 3 — Slab Down
Stage 4 — Brickwork / Framework
Stage 5 — Roof Cover
Stage 6 — Lock-Up
Stage 7 — Internal Works & Completion
Stage 8 — Final Inspection & Handover
ESTIMATED CONSTRUCTION TIMEFRAMES
Single Storey Home:
Approximately 6–8 months from commencement of construction, depending on the design, size and level of customisation.
Double Storey Home:
Approximately 10–12 months from commencement of construction, depending on the design, size and level of customisation.
Please Note Construction timeframes are estimates only and may vary depending on the complexity of the project, site conditions, approvals, material availability, weather, variations and other circumstances outside the builder’s reasonable control.